Civil Engineering Practice Test 7:  We are starting Civil Engineering practice question paper according to the new syllabus and changing exam patterns. In this, we are going to take important “Topics” practice questions for Civil Engineering Technical Subject. So let’s begin………

Civil Engineering Questions and Answers |  Civil Engineering Objective Questions and Answer

स्थापत्य अभियांत्रिकी सराव चाचणी ७ : आम्ही नवीन अभ्यासक्रमानुसार आणि बदलत्या परीक्षेच्या पद्धतीनुसार स्थापत्य अभियांत्रिकी सराव प्रश्नपत्रिका सुरू करत आहोत. यामध्ये आपण स्थापत्य अभियांत्रिकी तांत्रिक विषयासाठी महत्त्वाचे “विषय” सराव प्रश्न घेणार आहोत. चला तर मग सुरुवात करूया……..

तसेच या संदर्भातील पुढील सर्व अपडेट्ससाठी या लिंक वरून आपण आमच्या टेलिग्राम चॅनलला जॉईन करावे किंवा या लिंक वरून महाभरती एक्सामची अधिकृत अँप आपल्या मोबाईल मध्ये डाउनलोड करावी आणि अधिक ताज्या आणि अधिकृत महाराष्ट्र परीक्षेच्या अपडेटसाठी MahaBharti.in/exam फॉलो करा:

Click Here For All Civil Engineering MCQ Practice Tests For Maharashtra Exam

985
Created on By MahaBharti Exam Team
Civil Engineering Practice Test 4

Civil Engineering Practice Test 7

महाराष्ट्रातील सर्व भरती परीक्षेस उपयुक्त नवीन IBPS/TCS पॅटर्न नुसार प्रश्न

1 / 15

Theory of probability is applied to _____

2 / 15

Wedge storage in a river reach during passage of a flood wave in the rising phase is______

3 / 15

The most desirable alignment of an irrigation canal is along ______

4 / 15

Under normal conditions using an ordinary cement, the period of removal of the form work, is ______

5 / 15

Gases, which are generally envolved during aerobic decomposition of sewage, are _____

6 / 15

The true bearing of a line can be calculated as ____ where declination is to the east.

7 / 15

Compensating errors in chaining are _______

8 / 15

Minimum shear reinforcement is provided to _____

9 / 15

Muskinghain method of flood - routing is a

10 / 15

Errors which remain after mistakes and systematic errors have been eliminated are called _____

11 / 15

Method used for chaining on sloping ground is

12 / 15

Offsets are ____

13 / 15

In survey works declinations varies from time to time and place to place. The most important variation is ______

14 / 15

An error under the same conditions always of the same size and sign, is called ____

15 / 15

Secular variation is important factor because