JOIN Telegram

स्थापत्य अभियांत्रिकी सराव प्रश्नपत्रिका क्रमांक १२ | Civil Engineering Practice Test 12

Civil Engineering Practice Test 12

Civil Engineering Practice Test 12:  We are starting Civil Engineering practice question paper according to the new syllabus and changing exam patterns. In this, we are going to take important “Topics” practice questions for Civil Engineering Technical Subject. So let’s begin………

Civil Engineering Questions and Answers | Civil Engineering Objective Questions and Answer

स्थापत्य अभियांत्रिकी सराव चाचणी १२ : आम्ही नवीन अभ्यासक्रमानुसार आणि बदलत्या परीक्षेच्या पद्धतीनुसार स्थापत्य अभियांत्रिकी सराव प्रश्नपत्रिका सुरू करत आहोत. यामध्ये आपण स्थापत्य अभियांत्रिकी तांत्रिक विषयासाठी महत्त्वाचे “विषय” सराव प्रश्न घेणार आहोत. चला तर मग सुरुवात करूया……..

तसेच या संदर्भातील पुढील सर्व अपडेट्ससाठी या लिंक वरून आपण आमच्या टेलिग्राम चॅनलला जॉईन करावे किंवा या लिंक वरून महाभरती एक्सामची अधिकृत अँप आपल्या मोबाईल मध्ये डाउनलोड करावी आणि अधिक ताज्या आणि अधिकृत महाराष्ट्र परीक्षेच्या अपडेटसाठी MahaBharti.in/exam फॉलो करा:

Click Here For All Civil Engineering MCQ Practice Tests For Maharashtra Exam

2236
Created on By MahaBharti Exam Team
Civil Engineering Practice Test 4

Civil Engineering Practice Test 12

महाराष्ट्रातील सर्व भरती परीक्षेस उपयुक्त नवीन IBPS/TCS पॅटर्न नुसार प्रश्न

1 / 15

Lateral ties in RC column are provided to resist

2 / 15

The chances of diagonal tension cracks in R.C.C member reduce when

3 / 15

The maximum deflection in timber beams or joints should not be greater than

4 / 15

In a post-tension prestressed concrete beam, the end block zone is between the end of the beam and the section where

5 / 15

Minimum tension steel in RC beam needs to be provided to .......

6 / 15

Traps are used in household drainage system to

7 / 15

In limit state design, the maximum limit imposed by lS:456-1978 on the redistribution of moments in statically indeterminate beams is _____

8 / 15

Prestressing losses in post - tensioned and pretensioned beams are respectively ______

9 / 15

Area method of land filling is most suitable when

10 / 15

Under natural conditions of flow an unpolluted river would contain

11 / 15

Under normal conditions using an ordinary cement, the period of removal of the formwork is _____

12 / 15

The chances of diagonal tension cracks in R.C.C member reduce when

13 / 15

The type of valve which is provided to control the flow of water in the distribution system at street corners and where the pipe lines intersect is _____

14 / 15

According to Whitney's theory. maximum depth of concrete stress block in a blanced RCC beam section of depth 'd' is ____

15 / 15

Bond strength between steel and concrete is due to _____

Your score is